Scheda tecnica (Technical Rider)
The production section of the artist contract rider. It lists the stage dimensions, power service, PA and lighting specifications, monitor requirements, backline, local crew calls, and attached stage plot and input list a venue must provide, forming the technical basis the advance is confirmed against.
Nella pratica
The technical rider travels with the hospitality rider as the contract attachment, then becomes the reference document for the advance two to four weeks out. The production manager or touring audio engineer owns its contents; the tour manager sends it as part of the advance packet. Anything the venue cannot supply has to be resolved in writing before show day, not discovered at load-in.
What a complete technical rider contains
A venue should be able to staff, power, and patch the show from the rider alone. Every section left out becomes a question in the advance, which means it gets answered under time pressure instead of on paper. Most technical riders break into the same core blocks:
- Header block: artist name, tour, revision date, version number, and the production contact who answers technical questions.
- Stage and dimensions: minimum stage size, trim height, wing space, barricade needs, and riser requirements.
- Power service: total amperage, phase, disconnect location, shore power for the bus, and isolated circuits for audio and lighting.
- Audio: house PA adequacy notes, console preferences, monitor mix counts, and the input list and stage plot attached as exhibits.
- Lighting: rig requirements, console type, house rig sufficiency, and any touring floor package or haze permissions.
- Backline and gear: what the tour carries versus what the venue or a local rental must supply, with acceptable substitutions named.
- Crew: local stagehand counts by department, call times, and required specialists such as riggers or spotlight operators.
- Schedule constraints: load-in access needs, soundcheck duration, curfew, and turnaround requirements for changeovers.
Technical rider vs. hospitality rider vs. advance
The rider is one contract attachment with two halves that go to different readers. The technical rider goes to the production side: house audio engineers, lighting directors, stage managers, and crew schedulers. The hospitality rider goes to the promoter rep and backstage operations: dressing rooms, catering, runners, and towels. Mixing the two guarantees the wrong person answers your questions.
The rider is also not the advance. The rider states what the production needs as a contract requirement; the advance is the working conversation that confirms what the room can actually deliver. A venue that cannot meet a rider line answers it during the advance with a substitution or buyout, not on show day.
What venue crews actually read
House engineers read the input list, stage plot, and power section first and skim the rest. Production managers read staging, rigging, and crew calls. Nobody reads a three-paragraph essay about the band. A rider works when every line is a checkable requirement with a number attached: channels, mixes, amps, feet, minutes.
That is also why riders should separate needs from wants. Marking a preferred console as "or comparable" gets a real answer during advancing; burying a genuine requirement inside a wishlist gets it treated as optional. If the show cannot happen without it, say so plainly.
When a technical rider goes wrong
Rider failures are predictable, and each one surfaces at the worst possible moment:
- Gear specs gone stale: the rider still lists the console the band sold two tours ago, so the advance confirms the wrong desk.
- Wants disguised as needs: a wishlist formatted like a requirement list gets priced as requirements, and the promoter cuts the wrong things.
- Rider, plot, and input list disagreeing: the rider says 24 channels, the list shows 32, and the venue trusts neither.
- Requirements scaled for arenas sent to clubs: demanding 96 inputs and four followspots from a 300-cap room signals the rider was never tailored.
- No revision date or version: the venue answers a two-year-old rider while the current show carries a different rig.
- Contract copy-paste artifacts: another artist's name or a festival-only clause left in, which makes every real requirement look negotiable.
Approfondisci
- Modello gratuito di stage plot e input list
- Creatore gratuito di stage plot (esportazione PNG o PDF)
- Modello gratuito di scheda di avanzamento
- Come fare l'advance di una data, passo dopo passo
- Glossary: rider
- Glossary: hospitality rider
- Glossario: stage plot (pianta palco)
- Glossario: input list (lista canali)
- Glossario: advance (avanzamento)
- Funzionalità di avanzamento in TourPro
Domande frequenti
- What is a technical rider?
- A technical rider is the production section of an artist contract rider. It lists the equipment, staging, power, audio, lighting, and crew requirements a venue must provide for the show, usually with the stage plot and input list attached. The venue uses it to plan the room before the tour arrives.
- What is the difference between a technical rider and a hospitality rider?
- The technical rider covers production needs: stage size, power service, PA, monitors, lighting, backline, and local crew. The hospitality rider covers comfort: dressing rooms, catering, drinks, towels, and transportation. Both attach to the same performance contract but are read and fulfilled by different venue staff.
- Who writes the technical rider for a tour?
- The production manager or touring front-of-house engineer writes the technical sections, and the tour manager assembles the full rider packet and sends it during advancing. On tours without dedicated production crew, the tour manager or bandleader writes it with input from the musicians.
- What is the difference between a technical rider and a stage plot?
- The technical rider is the requirements document stating what the venue must provide. The stage plot is a top-down diagram showing where the band and equipment physically sit on stage. The plot travels inside the rider packet alongside the input list, and all three must agree.
- How often should a technical rider be updated?
- Whenever the lineup, rig, or production changes, and at the start of each new tour leg. Every revision should carry a version number and revision date so the venue can confirm it is answering the current rider instead of a stale copy.